Green energy open access
Not enough roof?
Bring the solar plant to you.
If your contracted demand is 100 kW or more, you can source solar power from an off-site plant and have it delivered through the grid, as captive, group captive or third-party supply.
Eligibility
100 kW and above.
Under the green energy open access framework, consumers with a contracted demand or sanctioned load of 100 kW or more can apply. In Haryana, multiple connections in the same electricity division can be combined to reach 100 kW.
Captive
You own (or hold the required equity in) the plant and consume its power.
Group captive
Several consumers share ownership of one plant, each meeting the ownership and consumption rules.
Third-party supply
Buy green power from a developer under a long-term agreement.
How we deliver
From feasibility to first units.
Feasibility & savings model
Landed cost per unit after transmission, wheeling and other charges, compared with your grid tariff.
Land & plant
Site selection (including Zavira Realty land), design and turnkey construction.
Connectivity & approvals
Applications to the nodal agency, connectivity and scheduling arrangements.
Operations
Generation monitoring, O&M and monthly reporting.
FAQ
Questions we’re often asked
How much can open access save?
It depends on your tariff and the open-access charges in your state at the time. We build a landed-cost model for your connection before you commit.
How long does it take?
Longer than a rooftop: land, plant construction and approvals typically run over several months. We give you a timeline in the feasibility report.
Do you work outside Haryana?
Yes. We develop open access and rooftop projects across India. Open access rules differ by state, so we check feasibility under your state’s green energy open access regulations first.
Feasibility
Get an open access feasibility check.
Tell us your contracted demand and monthly consumption.
Prefer to talk? +91 95184 44442 · +91 98963 58788 · WhatsApp